FRANKLIN COUNTY EMERGENCY MANAGEMENT (FCEM)
FACT SHEET: NUCLEAR POWER PLANT EMERGENCY
|
Since 1980, each utility that owns a commercial nuclear power plant in the United States has been required to have both an onsite and offsite emergency response plan as a condition of obtaining and maintaining a license to operate that plant. Onsite emergency response plans are approved by the Nuclear Regulatory Commission (NRC). Offsite plans (which are closely coordinated with the utility's onsite emergency response plan) are evaluated by the Federal Emergency Management Agency (FEMA) and provided to the NRC, who must consider the FEMA findings when issuing or maintaining a license.
Federal law establishes the criterion for determining the adequacy of offsite planning and preparedness, i.e: "Plans and preparedness must be determined to adequately protect the public health and safety by providing reasonable assurance that appropriate measures can be taken offsite in the event of a radiological emergency." Although construction and operation of nuclear power plants are closely monitored and regulated by the NRC, an accident, though unlikely, is possible. The potential danger from an accident at a nuclear power plant is exposure to radiation. This exposure could come from the release of radioactive material from the plant into the environment, usually characterized by a plume (cloud-like) formation. The area the radioactive release may affect is determined by the amount released from the plant, wind direction and speed and weather conditions (i.e., rain, snow, etc.) which would quickly drive the radioactive material to the ground, hence causing increased deposition of radionuclides. If a release of radiation occurs, the levels of radioactivity will be monitored by authorities from Federal and State governments, and the utility, to determine the potential danger in order to protect the public.
|